Sign In | Join Free | My tjskl.org.cn
China Guangzhou Jet Scaffold & Formwork System Co., Ltd. logo
Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Guangzhou Jet Scaffold & Formwork System Co., Ltd. Quality is the future
Active Member

6 Years

Home > Construction Formwork System >

Painted Concrete Slab Formwork Systems Circular Column Formwork High Turnover Frequency

Guangzhou Jet Scaffold & Formwork System Co., Ltd.

Painted Concrete Slab Formwork Systems Circular Column Formwork High Turnover Frequency

Brand Name : JET

Model Number : Steel formwork system

Certification : SGS, CE

Place of Origin : Guangzhou

MOQ : 100 square meters

Price : negotiable

Payment Terms : T/T, L/C, MoneyGram, Western Union

Supply Ability : 1000 sqm meter per week

Delivery Time : 15 work days

Packaging Details : 1. Scaffolding Frame is bare package , loading in containr 2. In pallet 3. As you required

Life : More than 5 years

Material : Q235 Steel

Thickness : 3-6 mm

Colour : Red / blue / yellow

Performance : Easy to establish

Application : Concrete construction

Length : 1800mm-1200mm

Width : 600-200mm

Surfacement : Painted,powder coated,hot dip galvanized

Using range : Building / bridge / tank / tunnel / road

Contact Now

High Turnover Frequency Concrete Wall Panels Steel Formwork System For Construction With Best Price

Product Description


Features:

1. Quickly and accurately assembled

2. Reduces the albor cost owing to its easy installation

3. Light weight component provides low pressure on the lower part of the buildings

Flat steel formwork

Code Length(mm) Width(mm) Height(mm) Thickness(mm) Suface treat Weight(kg)
FF1800-600 1800 600 50 3 Painted 40.98
FF1800-450 1800 450 50 3 Painted 31.26
FF1800-300 1800 300 50 3 Painted 21.55
FF1800-200 1800 200 50 3 Painted 14.37
FF1500-600 1500 600 50 3 Painted 34.27
FF1500-450 1500 450 50 3 Painted 26.14
FF1500-300 1500 300 50 3 Painted 18.02
FF1500-200 1500 200 50 3 Painted 12.01
FF1200-600 1200 600 50 3 Painted 27.55
FF1200-450 1200 450 50 3 Painted 21.02
FF1200-300 1200 300 50 3 Painted 14.48
FF1200-200 1200 200 50 3 Painted 9.66

Corner angle steel formwork:

Code Length(mm) Flange height(mm) Thickness(mm) Surface treat Weight(kg)
FC1800 1800 50*50 3 Painted 4.45
FC1500 1500 50*50 3 Painted 3.71
FC1200 1200 50*50 3 Painted 2.97

External corner steel formwork:

Code Length(mm) Flange height(mm) Thickness(mm) Surface Treatment Weight(kg)
FEX1800 1800 100*100 3 Painted 16.35
FEX1500 1500 100*100 3 Painted 13.76
FEX1200 1200 100*100 3 Painted 11.17

Internal Corner steel formwork:

Code Length(mm) Flange Height(mm) Thickness(mm) Surface Treatment(mm) Weight(kg)
FIN1800 1800 100*100 3 Painted 15.21
FIN1500 1500 100*100 3 Painted 12.76
FIN1200 1200 100*100 3 Painted 10.31

Product Photos

Painted Concrete Slab Formwork Systems Circular Column Formwork High Turnover Frequency

Our Advantage


Our Advantage

1. Energy saving and environmental protection, save 2/3 steel than bowl button scaffolding .

2. Hot dip galvanizing process, the service life for more than 15 years.

3. New carbon steel, high strength mechanical properties, pole load up to 200KN.

4. Gravity self-locking,can prevent ledger slippage effectively,make the construction more safety.

5. Easy to remove the tower, save time and effort, the tower speed of the steel pipe fastener scaffolding 4 to 8 times, for the bowl buckle scaffolding 2 times.

6. Standard modules, efficient management, easy to transport and construction management, reduce the risk of loss damage.

Our Company


JET has been established in Guangzhou,China.

We offer services with material of high standard undisputed quality services with competitive rates.and we provide complete solutions of scaffolding and formwork system to the construction industry.

Our varied products mix of Ringlock system,Frame system,Steel plank,Steel prop,Scaffolding pipe and all kind of couplers, with high quality for commercial and industrial construction industries.

Many of our client base are returning customers whom we have known and worked for many years.

Our products have enjoyed great popular at home and abroad,Such as America,Australia,Europe,the Middle east and so on.

FAQ

1. Question: What's your MOQ(minimum order quantity)?

Answer: One full container.

2. Question: What's your packing methods?

Answer: Packed into bundle, and rest in bulk.

3. Question: What's your payment terms?

Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status.

4. Question: What's your delivery time?

Answer: 10-20 days after received the advance payment or L/C.

5. Question: Are you manufacturer or trader?

Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.

6. Question: Where's your factory?

Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.

7. Question: Can we visit your factory?

Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

8. Question: Can you supply other scaffolding materials?

Answer: Yes. All related scaffolding materials.

(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

(4) steel coupler (preesed / drop forged coupler)

(5) steel plank with hooks or without hooks

(6) steel stair case


Product Tags:

aluminium slab formwork

      

lightweight formwork systems

      
Quality Painted Concrete Slab Formwork Systems Circular Column Formwork High Turnover Frequency for sale

Painted Concrete Slab Formwork Systems Circular Column Formwork High Turnover Frequency Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangzhou Jet Scaffold & Formwork System Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)